EVALUASI KINERJA SIMPANG TIGA BERSINYAL DAN PENGARUH TERHADAP BIAYA BAHAN BAKAR MINYAK

  • Hesti Dwida Austin Kudji
  • Ratri Andinisari ITN Malang

Abstract

The increase in traffic volume that is not matched by intersection capacity has resulted in increased delay, queue length, and fuel consumption of Diponegoro Street-Hayam Wuruk Street-Gondanglegi, Malang Refency. The study aimed to evaluate the intersection performance using the 2023 Indonesian Highway Capacity Guidelines (PKJI 2023) and PTV Vissim 25 simulation, analyse the effect of delay on fuel consumption cost (BiBBM) using the LAPI-ITB method, evaluate the effectiveness of improvement alternatives, and predict the intersection performance over the next five years. The data used consisted of primary data obtained from field surveys, including traffic volume, intersection geometry, queue length, and signal cycle time, as well as secondary data collected from supporting literature. The analysis was conducted based on capacity, degree of saturation, queue length, delay, and level of service in accordance with PKJI 2023 and Minister of Transportation Regulation No. 96 of 2015. The analysis of the existing condition dhowed a peak-hour traffic volume of 2,069.5 PCU/h, a degree of saturation of 1.04, and an average delay of 58,64 s/PCU based on PKJI 2023 and 59.14 s/PCU based on PTV Vissim 25, indicating Level of Service (LOS) E. Simple linear regression analysis for motorcycles produced the equation  with correlation coefficient of , indicating a very strong relationship between delay and fuel consumption cost. The implementation of improvement Alternative II resulted in a degree of saturation <0.85, with an average delay of 23,676 s/PCU based on PKJI 2023 and 33s/PCU based on PTV Vissim 25 (LOS C). The five-year  prediction after the implementation of the improvement alternative showed an average delay of 31.50 s/PCU with Level of Service (LOS) D.

Downloads

Download data is not yet available.
Published
2026-11-03