PENGEMBANGAN SISTEM DISTRIBUSI AIR BERSIH DI KECAMATAN KARANGPLOSO KABUPATEN MALANG

  • Eristanto Ananta
  • Ratri Andinisari ITN Malang

Abstract

Clean water distribution in Karangploso Sub-district, Malang Regency, has not fully reached all residents; only about 42% of the population is currently served by the local water utility (PDAM), leaving Donowarih, Tawangargo, Bocek, and Ngenep villages unserved. This study aims to plan the development of a clean water distribution system by utilising the Cinde spring as the raw water source. Population projection was carried out using the arithmetic, geometric, and least square methods, with the geometric method selected based on the smallest standard deviation (4,762.44). Water demand analysis followed the Ministry of Public Works standard, while the transmission and distribution pipe networks were modelled using WaterCAD V8i. The results show that the total clean water demand in Karangploso Sub-district up to the year 2029 reaches 151.46 litres/second, and the available discharge of the Cinde spring (156 litres/second) is still sufficient to meet this demand. The planned reservoir capacity is 1,712.06 m3 with dimensions of 21 m x 20 m x 4 m, the transmission pipe is 11,475 m long with a diameter of 642.2 mm, and the distribution pipe is 58,771 m long with a diameter of 285 mm. Flow velocities and residual pressures at all network nodes meet the requirements of Minister of Public Works Regulation No. 18/PRT/M/2012.

Downloads

Download data is not yet available.
Published
2026-11-02