PENERAPAN METODE FAILURE MODE AND EFFECT ANALYSIS DALAM MENETAPKAN PRIORITAS RISIKO PROYEK PEMBANGUNAN GEDUNG BERTINGKAT

  • Achmad Maulana Farabi
  • Ratri Andinisari ITN Malang

Abstract

High-rise building construction projects are highly complex and vulnerable to various risks that can hinder project execution in terms of time, cost, and quality. This study aims to identify and prioritize risks in the construction project of the Tsurayya Islamic School Dormitory Building in Malang using the Failure Mode and Effect Analysis (FMEA) method. The analysis results indicate that the most dominant risk is rain/flooding with an RPN value of 75, followed by incompetent workers and material procurement delays, each with an RPN value of 60. Based on these findings, mitigation actions were taken, including schedule adjustments, workforce training, coordination with suppliers, and the provision of backup vendors. This study demonstrates that the systematic application of risk management can help anticipate and control potential risks during the implementation of construction projects.

Downloads

Download data is not yet available.
Published
2026-10-30