PENERAPAN METODE CRITICAL PATH METHOD (CPM) UNTUK PENJADWALAN DAN PEMBIAYAAN PEKERJAAN STRUKTUR ATAS PROYEK PEMBANGUNAN JEMBATAN PT. SAWIT LAMANDAU RAYA KABUPATEN LAMANDAU KALIMANTAN TENGAH

  • Sandi Prima Sianipa
  • Ratri Andinisari ITN Malang

Abstract

Project implementation requires proper planning, scheduling, and management, including resources, availability of materials, equipment, natural conditions, weather conditions, and other factors that affect project progress. Project planning describes the relationships between activities and the entire project, and helps determine the priority of relationships between activities. This study aims to (1) analyze the total cost and time planning for the superstructure work of the PT. Sawit Lamandau Raya bridge construction, and (2) analyze the difference in time and cost after re-analysis of the superstructure work of the PT. Sawit Lamandau Raya bridge construction. This study uses the CPM method. This method analyzes the implementation time of the superstructure work of the PT. Sawit Lamandau Raya bridge construction in Lamandau Regency.

Based on the analysis results, it was found that the total planning cost and implementation time were Rp 11.678.893.800,00 and 106 days. After being analyzed using the CPM method, it was found that there was an additional planning cost of Rp 540.000,00 so that the total planning cost became Rp 11.698.541.800,00 and the implementation time was accelerated by 13 days, so that the implementation time for the upper structure work of the bridge construction project became 93 days. This study shows that systematic scheduling can accelerate the construction process of the bridge project.

Downloads

Download data is not yet available.
Published
2026-10-30