Articles

KAJIAN EMBUNG PADA KALI KEDUNG WARU UNTUK PENANGGULANGAN BANJIR KABUPATEN TULUNGAGUNG

Akhmad Dwi Prasetiya, Kustamar, Hirijanto

1-6 |

DOI : https://doi.org/10.36040/sondir.v1i1.2560

ANALISA PERBANDINGAN PORTAL GABLE FRAME BAJA WF DAN STRUKTUR RANGKA BAJA SIKU DAN T

Al Imran, Ir. Ester Priskasari, MT, Ir. Agus Santosa, MT

1-6 |

DOI : https://doi.org/10.36040/sondir.v1i1.2561

EVALUASI KINERJA PERSIMPANGAN JALAN GAJAYANA – JALAN SIMPANG GAJAYANA MALANG

Astri Wida Perwitasari, Kamidjo Raharjo, Nusa Sebayang

1-8 |

DOI : https://doi.org/10.36040/sondir.v1i1.2562

ANALISA KINERJA WAKTU DAN BIAYA PROYEK MENGGUNAKAN EARNED VALUE METHOD

Indra Ginantaka, Deviani Kartika

1-8 |

DOI : https://doi.org/10.36040/sondir.v1i1.2563

PEMANFAATAN SERBUK ARANG BATOK KELAPA SEBAGAI BAHAN TAMBAH DENGAN FILLER ABU BATU UNTUK MENINGKATKAN KINERJA KARAKTERISTIK BETON ASPAL (AC-WC)

Misbakhul Fitria Nur, Eding Iskak Imananto , Agus Prajitno

1-9 |

DOI : https://doi.org/10.36040/sondir.v1i1.2564

PERKUATAN KOLOM BETON BERTULANG PERSEGI DENGAN MENGGUNAKAN FINE MESH Ø 4 – 50

Ratih Prawirawati, Sudirman Indra, Togi H. Nainggolan

1-7 |

DOI : https://doi.org/10.36040/sondir.v1i1.2565