ANALISIS LENDUTAN, SAMBUNGAN DAN POT BEARING STRUKTUR ATAS PADA JEMBATAN KALI GEDE TIPE PRATT TRUSS
Abstrak
The Kali Gede Bridge is part of the Southern Cross Route project in Trenggalek Regency which was built to improve connectivity with Tulungagung Regency. The existing bridge uses a 120 m long Warren Truss type steel frame, while this research plans an alternative superstructure using a Pratt Truss type steel frame. Analysis and planning were carried out using the Load and Resistance Factor Design (LRFD) method based on SNI 1725:2016 for bridge loading and SNI 1729:2020 for planning steel structures and connections. Modeling and structural analysis were carried out using STAAD Pro V8i software. The planned superstructure includes the vehicle floor plate, longitudinal and transverse girders, mains, main frame elements, wind ties, connections and placement of bearing pots. The planning results show that the floor plate uses main reinforcement D16-100 and reinforcement for D13-250, longitudinal girder WF 500x200x10x16, transverse girder WF 900x300x16x28, main box girder 1500x800x50, upper transverse girder H-Beam 250x250x9x14, vertical beam HWF 700x650x25x30, WF diagonal rod 700x550x20x25, pipe upper wind bond Ø267.4x15.1, 2L lower wind bond 200x200x25, with maximum deflection of 54.52 mm, smaller than the clearance limit of 120 mm (L/1000), and placement in the form of a fixed type pot bearing model FX 24000-7200 and guided model GG 18000-1800-100. These results show that the design obtained meets the requirements for strength, stability and structural performance according to the LRFD method so that it is suitable to be applied as an alternative planning for the Kali Gede Bridge.