PENANGGULANGAN BANJIR KAWASAN PENARAGA KOTA BIMA PROVINSI NUSA TENGGARA BARAT
Abstrak
Land-use change from agricultural areas to residential zones in the Penaraga Area, Bima City, West Nusa Tenggara Province, has significantly reduced water catchment areas. Consequently, high-intensity rainfall triggers overflows in the drainage dimensions, causing flood inundation with depths of 30–50 cm for approximately 2 hours. This study aims to evaluate the performance of the existing drainage system and redesign the optimal channel dimensions as a flood mitigation effort in the area. The research method begins with collecting existing channel dimensions and maximum daily rainfall data over a 10-year period (2016–2025). Hydrological analysis includes calculating average rainfall using the Thiessen Polygon method, frequency analysis utilizing the E.J. Gumbel distribution, and suitability tests via Chi-Square and Smirnov-Kolmogorov methods. The 10-year return period design flood discharge is calculated using the Rational Method, while the evaluation of channel hydraulic capacity employs Manning's equation. The analysis results indicate that the existing drainage system is inadequate; out of 50 evaluated channels, 38 are unable to accommodate the design flood discharge. For instance, the Veteran Street (right) channel has a design flood discharge of 0.743 m³/second, whereas its existing capacity is only 0.171 m³/second. In conclusion, this study recommends replacing the channel material from river stone masonry to precast concrete U-ditch channels and enlarging the cross-sectional dimensions, such as reshaping Veteran Street (right) to 0.60 m x 0.60 m to safely convey the water flow. Furthermore, periodic maintenance, including sediment dredging and garbage cleaning, is essential to sustain optimal drainage system performance.