EVALUASI KINERJA SIMPANG TIGA BERSINYAL DAN PREDIKSI KERUGIAN BIAYA OPERASIONAL KENDARAAN (BOK) AKIBAT KEMACETAN LALU LINTAS (Studi Kasus Simpang : Jl. Raya Geluran-Jl. Raya Taman-Jl. Raya Kletek, Kecamatan Taman, Kabupaten Sidoarjo, Provinsi Jawa Timur)
Abstrak
Roads are transportation infrastructure that plays a vital role in supporting mobility. An increase in vehicle volume that is not matched by road capacity can lead to traffic congestion, as is the case at the signalized intersection of Jl. Raya Geluran, Jl. Raya Taman, and Jl. Raya Kletek in Sidoarjo Regency. This study aims to evaluate the intersection’s performance under existing conditions based on the 2023 Indonesian Road Capacity Guidelines (PKJI), formulate alternative improvement solutions, analyze the relationship between travel delay and fuel consumption under both existing and alternative conditions, and predict the intersection’s performance over the next five years. Performance analysis was conducted using the 2023 Indonesian Road Capacity Guidelines (PKJI) and Vissim 25 PTV modeling. The results show that the intersection’s current conditions have an F level of service with an average delay of 219.396 seconds per SMP, indicating that the intersection is unable to accommodate the existing traffic volume. The proposed alternatives—optimizing the three-phase signal timing, widening the road geometry by 0.4 meters, and implementing a straight-through lane on the eastern approach—result in an average delay of 22.66 seconds per SMP with a service level of C. The cost of losses due to traffic congestion for the accumulated time period amounts to Rp. 3,431,181.68 per hour, Rp. 27,449,453.42 per day, Rp. 548,989,068.43 per month, and Rp. 6,587,868,821.20 per year. Linear regression analysis shows a very strong relationship between delay and fuel consumption costs, with a correlation coefficient of r = 0.806 under the existing conditions: Y = 155,127.651 + 14,954,136. 0X and r = 0.852 under the alternative conditions Y = 114,774.24 + 15,142,766.6 X. The five-year forecast indicates a Level D level of service with an average delay of 29.76 seconds per SMP.