ANALISIS PERENCANAAN BIAYA DAN WAKTU PEKERJAAN GEDUNG LABORATURIUM DAN PERPUSTAKAN MAN INSAN CENDEKIA PASURUAN JAWA TIMUR

  • Alfan Dhiar Irfiawan
  • Ratri Andinisari ITN Malang

Abstrak

This study aims to analyze the cost and time planning in the construction project of the Man Insan Cendekia Laboratory and Library Building in Pasuruan, East Java. The technical data used includes working drawings, volume backups, Work Unit Price Analysis (AHSP). To perform this project analysis, Microsoft Excl software was used to analyze the Cost Budget Plan (RAB) and Scheduling. The results of the analysis showed that the calculation of the Cost Budget Plan (RAB) for preparatory work, K3 security and safety work, Foundation work, 1,2,3rd floor structure work and Roof work. The results show that the estimated total cost is Rp 2,130,393,000.00. With a settlement time of 5 months or about (150 days) of the calendar. To find the critical path in this research using the Critical Path Method (CPM) method with the analysis of the calculations above, it can be seen that the Total Float (TF) whose value = 0 is the activity B, E, I, K, L, M this means that the activity does not have a grace period to be late so it is called a critical activity and TF that has the value of the activity has a grace period, namely activity A, C,D,F,G,H,J.based on the normal duration of the project.

##plugins.generic.usageStats.downloads##

##plugins.generic.usageStats.noStats##
Diterbitkan
2026-10-30
Bagian
Articles