STUDI PERENCANAAN PERKERASAN LENTUR DAN PERKERASAN KAKU PADA RUAS JALAN WAISALA – TALAGA KAMBELU KABUPATEN SBB
Abstrak
The Trans Maluku Road on Seram Island serves as the main route connecting three regencies; however, it has not yet been fully integrated, leaving several areas isolated due to limited road infrastructure. One example is the Waisala – Talaga Kambelu section in West Seram Regency, specifically at STA 39+250 – STA 44+350, which remains in the form of gravel and has not been paved. Therefore, a comparative study between flexible and rigid pavement was carried out on a 5.1 km segment of the total 46 km using the 2024 Bina Marga Method.The planning includes pavement structure analysis, cost estimation (RAB) based on the 2024 Bina Marga Unit Price Analysis for Maluku Province, as well as the estimation of routine and periodic maintenance costs, considering inflation and the BI Rate over a 20-year design life.The results show that flexible pavement requires a total thickness of 46.5 cm (HRS-WC 3 cm, HRS-Base 3.5 cm, LFA A 25 cm, and LFA B 15 cm), while rigid pavement requires only a 15 cm concrete slab, a 10 cm lean concrete base, and 15 cm LFA A. The estimated cost for flexible pavement, including overlay and routine maintenance, is Rp 30.11 billion, while rigid pavement with routine maintenance amounts to Rp 20.78 billion.Thus, rigid pavement is more economical as it requires lower costs, has a longer design life, and involves relatively minimal maintenance compared to flexible pavement.