PENJADWALAN PROYEK JALAN NASIONAL MENGGUNAKAN METODE PDM: STUDI KASUS RUAS AIR NANANG – KOTA BARU MALUKU

  • Shafira Aisyahra Umagapy
  • Ratri Andinisari ITN Malang

Abstrak

Road construction plays an important role in improving interregional relations, promoting economic growth, and equitable development, especially in remote areas. One such effort is the National Road Construction Project for the Air Nanang–Kota Baru section in East Seram Regency, Maluku Province, covering the segment from STA 06+400 to STA 10+800. This study aims to develop a project implementation schedule using the Precedence Diagram Method (PDM) with Microsoft Project 2019 software. The planning results indicate a total project duration of 794 working days (2 years, 7 months, 17 days), with a difference of 316 days from the initial total duration, and 11 activities classified as critical. The results of this planning are expected to serve as a reference for initial simulations in scheduling the road construction project or similar projects.

 

##plugins.generic.usageStats.downloads##

##plugins.generic.usageStats.noStats##
Diterbitkan
2026-10-30
Bagian
Articles